No | Nama Peserta | K | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. MEUTHIA MULTI KONSULTAN - 03.051.559.7-801.000 | 67,71 | Rp. 127.765.000,00 |
Rp. 116.150.000,00 |
||||||||
2 | PT. MIFTAH MULTI DESIGN - 03.217.024.3-805.000 | 85,57 | Rp. 130.600.000,00 |
Rp. 130.600.000,00 |
||||||||
3 | PT. AURAMA KARYA KONSULTAN - 02.308.444.5-805.000 | 69,92 | Rp. 130.950.000,00 |
Rp. 130.950.000,00 |
||||||||
4 | CV. IRLOFA KARYA - 75.344.737.4-101.000 | |
|
|||||||||
5 | Tika Mutiara Ula - 75.865.955.1-425.000 | |
|
|||||||||
6 | CV. FINITE ELEMENT ENGINEERING - 03.330.813.1-801.000 | |
|
|||||||||
7 | CV. Andalas Karya - 03.093.207.3-315.000 | |
|
|||||||||
8 | PT. Moses Edgar Partogi Utama - 75.065.530.0-435.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak